Gloved hand troweling fresh white plaster in a drained pool

Home / HOA approval

Resurfacing your pool in an HOA: getting approval in Arizona.

A lot of Valley pools sit inside a homeowners association. Before a crew drains the pool, it's worth a short email to your HOA, because many associations want to see exterior work, pools included, before it starts. Here's what Arizona law says, what to send, and how to keep approval from holding up your resurface.

Arizona ROC-licensed pros onlyUp to three quotes, not a call listFree for homeowners

We're a free matching service, not a contractor. The pros who quote you are licensed by the Arizona Registrar of Contractors, and you can check any license with the ROC before you hire.

Get your free resurfacing quote

Step 1 of 3
Which finish are you thinking about?

For in-ground plaster, quartz or pebble pools. Not for fiberglass, vinyl or above-ground pools yet.

Free and no obligation. Takes about a minute.

Do you need HOA approval to resurface?

It depends on your CC&Rs and design guidelines, not on a statewide rule. Most Arizona HOAs require approval before you change the outside of your home, and pools and spas are one of the standard request types: Planned Development Services, an Arizona HOA management company, lists swimming pools and outdoor spas among the changes that need an architectural request. The same company's advice is the right default: when in doubt, submit a request.

Whether a same-color replaster counts as a change is up to your HOA's documents. A new finish color, tile, coping or deck work changes what the backyard looks like, so plan on sending a request for those. Your community manager can tell you which applies.

What Arizona law says

  1. Which law applies. Planned communities (most single-family HOAs) fall under the Planned Communities Act, A.R.S. Title 33, Chapter 16. Condo associations fall under the Condominium Act, Title 33, Chapter 9.
  2. No unreasonable refusals. A.R.S. 33-1817(B) says approval of a construction project's architectural designs and plans "shall not unreasonably be withheld."
  3. Who reviews. The same section requires any design review or architectural committee to include at least one board member, who chairs it.
  4. No set deadline. The statute sets no general deadline for a committee to decide. Ask your manager how often the committee meets and plan around it.

What to send your HOA

Your HOA's own form wins, but Arizona architectural request forms usually ask for:

  1. The work. A short description, for example "replaster existing pool, same shape, new finish."
  2. Finish details. The finish name and color, plus tile or coping choices if they're changing.
  3. Your contractor. Their name and contact details.
  4. The proposal. The contractor's written proposal.
  5. Dates. Planned start and finish dates.
  6. Photos. The pool as it is now.

What Valley communities publish

Every HOA writes its own rules, so the only way to know what yours wants is to read its own form. Here is what three Valley communities publish, to show the range. None of the three mentions resurfacing by name, so ask your HOA whether a same-color resurface, a color change or new tile counts as a modification before you assume either way.

Your own community's form and CC&Rs control. Read them, or ask the management company, before you book a drain date.

DC Ranch (Scottsdale)

DC Ranch's modification form (revised Nov. 21, 2024) says: "All pool and/or spa modification requests (new or a remodel) require a landscape plan. No exceptions." The Modification Committee meets the 2nd and 4th Tuesday of each month, and a complete submittal is due 11 days before the meeting.

The committee emails its decision within three days of the meeting. Every decision then goes to Covenant Commission review, which can take up to 10 more working days. The form cites CC&R Article 4.3: the committee responds within 30 days of a complete submittal.

DC Ranch's Design Review Fee Worksheet lists a $350 minimum (minor landscape, 30 or fewer plantings) or $400 minimum (major landscape, 31 or more), plus $300 for a pool and $200 for a spa. From submittal to final word can run several weeks, so get quotes and the contractor's written proposal early.

Anthem (Village at Anthem)

The Anthem Community Council's village page says applications "need to be completed for all new changes to your home or landscaping." An application includes a project plan showing the finished look, specifications such as materials, color samples and dimensions, and a photo of the existing structure when you're changing one.

The association says it notifies you by mail within 45 days of submittal whether the request is approved or denied. Ask your contractor for a finish sample or color chip to include with the application.

McCormick Ranch (Scottsdale)

McCormick Ranch Property Owners' Association says "any change that affects the exterior of a property (including structures and landscape) must be approved in advance," and "no installation or commencement of any work is permitted until approval is obtained."

It keeps a pre-approved paint palette, but a Paint Application still has to be filed before painting starts. The page gives no set review period. If your job includes new deck coating or a color change around the pool, ask whether it falls under the paint process as well.

Don't book the drain date yet

Ask your contractor for the finish name and color early, since forms ask for colors and finishes. Many forms also say work may not start until written approval is issued, so don't book the drain date until you have it.

Compare plaster, quartz and pebble finishes

HOA approval is separate from city rules

Your HOA can't sign off on city requirements, and the city doesn't check your CC&Rs. Draining still has to follow your city's rules (in Phoenix, through the sewer cleanout at no more than 12 gallons a minute). If the job changes your pool fence or gate, Phoenix requires a permit to alter or replace a pool barrier. Check with your city before you drain.

Phoenix drain and barrier rules

If you skip approval, or get denied

  1. Notice first. Under A.R.S. 33-1803, an HOA can fine an owner for breaking the community documents only after giving notice and a chance to be heard.
  2. 21 days to reply. If you get a written violation notice, you can reply by certified mail within 21 calendar days, and the association must answer in writing within 10 business days with the rule it says you broke and how to contest it.
  3. A state hearing. Owners can petition the Arizona Department of Real Estate for a hearing before an administrative law judge instead of going to court. The filing fee is $800 per issue.
  4. Get real advice. The Department doesn't regulate HOAs or give legal advice, so for a real dispute, talk to an attorney.

A simple order of steps

It's far cheaper to send the request first. A simple order:

  1. Quotes first. Get two or three written quotes and pick your finish.
  2. Then the HOA. Send the request with the contractor's proposal and finish details.
  3. Then the drain. Schedule it once written approval arrives.
  4. Keep the letter. File the approval with your pool paperwork for when you sell.

How to choose a resurfacing contractor

Start with quotes

Tell us about your pool and up to three licensed local contractors who fit the job can send quotes. Then send your HOA the one you pick.

This page is general information, not legal advice. Your CC&Rs and design guidelines control what your HOA requires.

Best time of year to resurface

Get quotes to send with your HOA form

Questions

Common questions

Does my HOA have to approve a pool resurface?

Only if your CC&Rs or design guidelines say so, and many Arizona HOAs do want to see pool work. A short email to your community manager settles it.

Can my HOA refuse my pool finish color?

An HOA can apply its design guidelines, but Arizona law says approval of a project's plans "shall not unreasonably be withheld" (A.R.S. 33-1817).

How long does HOA approval take?

Arizona law sets no general deadline, so it depends on your community. DC Ranch's committee says it responds within 30 days of a complete submittal, with a further Covenant Commission review of up to 10 working days, and Anthem's village association says it answers by mail within 45 days. Check your own HOA's form and send the request as soon as you've picked a contractor and finish.

Does the city need to approve a resurface too?

The HOA and the city are separate. Draining has to follow your city's rules, and in Phoenix, changing a pool fence or gate needs a permit.

Before you decide

Planning guides

Get a resurfacing quote this week

Spring dates go fast, so it pays to book early. It takes about a minute to ask.

Start my free quote
Get my free quote